Kamu Aydınlatma Platformu (KAP) Bildirimi:
Gönderim Tarihi
28.08.202609:00:41
Bildirim Tipi
ÖDA
Yıl
--
Periyot
-
Bildirim Ekleri (0)
Ek Dosya Yok!
Özet Bilgi
Yeni iş ilişkisi.
| [CONSOLIDATION_METHOD_TITLE] | [CONSOLIDATION_METHOD] |
İlgili Şirketler Related Companies | [] | |||||||||
İlgili Fonlar Related Funds | [] | |||||||||
Türkçe Turkish | İngilizce English | |||||||||
| ||||||||||
| Hayır | Hayır | ||||||||
| Hayır | Hayır | ||||||||
| - | - | ||||||||
| Hayır | Hayır | ||||||||
| ||||||||||
| Müşteri (Customer) | Müşteri (Customer) | ||||||||
| Azerenerji CJSC | Azerenerji CJSC | ||||||||
| - | - | ||||||||
| - | - | ||||||||
| 28/08/2026 | 28/08/2026 | ||||||||
| - | - | ||||||||
| Olumlu | Positive | ||||||||
| ||||||||||
Azerbaycan Nahçıvan Enerji Depolama Projesi Hakkında Şirketimiz, Azerbaycan'ın enerji şebeke işletmecisi Azerenerji CJSC ile Nahçıvan'da kurulacak toplam 40 MWh kapasiteli Batarya Enerji Depolama Sistemi'nin (BESS) anahtar teslim kurulumu için 9.538.080,59 ABD Doları tutarında sözleşme imzalamıştır. Sözleşme kapsamında; enerji depolama sisteminin mühendislik, tedarik, kurulum ve devreye alma çalışmaları ile ilgili şebeke işleri ve mevcut güneş enerji santraliyle entegrasyonu Şirketimiz tarafından gerçekleştirilecektir. Kurulacak sistem ile güneş enerjisinden üretilen elektriğin daha etkin ve esnek şekilde kullanılması, şebeke esnekliğinin artırılması ve yenilenebilir enerji kaynaklarının şebekeye entegrasyonunun desteklenmesi hedeflenmektedir. Söz konusu proje, Şirketimizin enerji depolama alanındaki yetkinliğinin ve Azerbaycan pazarındaki güçlü konumunun geliştirilmesi açısından önem taşımaktadır. Kamuoyuna ve yatırımcılarımıza saygıyla duyurulur. | Azerbaijan Nakhchivan Energy Storage Project Our Company has signed a contract with Azerenerji CJSC, Azerbaijan's power grid operator, for the turnkey installation of a Battery Energy Storage System (BESS) with a total capacity of 40 MWh to be installed in Nakhchivan. The total contract value is USD 9,538,080.59. Under the scope of the contract, our Company will undertake the engineering, procurement, installation and commissioning of the energy storage system, including the related grid works, as well as its integration with the existing solar power plant. The system will contribute to the more efficient and flexible utilization of electricity generated from solar energy, enhance grid flexibility and support the further integration of renewable energy sources into the power grid. The project is of strategic importance in further strengthening our Company's capabilities in the energy storage sector and its strong position in the Azerbaijani market. Respectfully announced to the public and our investors. | |||||||||
Yukarıdaki açıklamalarımızın, Sermaye Piyasası Kurulu'nun yürürlükteki Özel Durumlar Tebliğinde yer alan esaslara uygun olduğunu, bu konuda/konularda tarafımıza ulaşan bilgileri tam olarak yansıttığını, bilgilerin defter, kayıt ve belgelerimize uygun olduğunu, konuyla ilgili bilgileri tam ve doğru olarak elde etmek için gerekli tüm çabaları gösterdiğimizi ve yapılan bu açıklamalardan sorumlu olduğumuzu beyan ederiz.
NİHAL GÜLFİDAN
MUHASEBE MÜDÜRÜ
YEO TEKNOLOJİ ENERJİ VE ENDÜSTRİ A.Ş.
28.08.2026 08:41:56
DERYA EROĞLU
İÇ DENETİM UZMANI
YEO TEKNOLOJİ ENERJİ VE ENDÜSTRİ A.Ş.
28.08.2026 09:00:05
Türkiye Sermaye Piyasaları - Merkezi Saklama ve Veri Depolama Kuruluşu
Sermaye Piyasası Kurulu (SPK) kuralları gereği Kamuyu Aydınlatma Platformu'na iletilen bildirimin eklerine (varsa PDF vb.) ulaşmak için aşağıdaki bağlantıyı kullanabilirsiniz.